The Site Condition Reports, permit applications and Environment Agency compliance responses that keep a permitted facility settled — from application baseline to clean surrender.
For an operator, a permit is only ever as settled as the paperwork behind it. I prepare the Site Condition Reports, applications and compliance responses that keep a permitted facility on the right side of the Environment Agency — from the baseline set at application through to a clean surrender at the end of a site's life.
The application-stage Site Condition Report (the H5 baseline) establishes the reference position for the entire life of a permit: baseline soil and groundwater conditions, and a clear characterisation of the pollution risk the proposed activity actually poses. Because surrender is later judged against this baseline, a well-drawn application SCR is quietly where most of the money is saved — years before anyone thinks about handing the permit back.
Surrender is the mirror image: demonstrating, with the investigation and data to support it, that no unacceptable pollution risk remains, and satisfying the regulator at first application rather than after a round of queries. I have taken heavily contaminated sites — including a seventy-year-old riverside scrapyard and a waste transfer and materials recycling facility — through investigation, remediation and validation to surrender accepted first time.
Preparation of the technical elements of new permit applications for waste and industrial sites — establishing baseline conditions, characterising risk to soil and controlled waters, and setting the reference position each site is later assessed against.
When the Agency issues a Compliance Assessment Report, the instinct is often to concede the point. Frequently the exceedance has a defensible source. I prepare the technical response — forensic groundwater and ground-gas analysis to establish the true cause, and a verification and monitoring programme agreed with the regulator — so a facility is judged on the evidence rather than the first reading of the data.
For landfill and waste operators, the day-to-day of a permit is monitoring, annual reporting, long-term groundwater data and Environment Agency correspondence. I manage that reporting across multiple operators, keeping compliance current and the regulatory relationship steady.
Permit surrender, application Site Condition Reports, EA Compliance Assessment responses and long-term landfill compliance reporting across waste and landfill operators. See selected projects →
One or two projects a year, done properly. If the fit is right, I'd be glad to talk it through.
Make an enquiry